The construction for the 4th floor of the Annex is almost complete. The Skywalk is now open to traffic, but limited to the throughway as there is still construction and moving going on. The space will be available for viewing at a later date.

Evans 2nd floor study area will be closed off starting Monday, August 7th.

Maps & GIS has been moved to room 207 during the 2nd floor construction.

updates to ReImagine Construction

Texas A&M Libraries is being Renovated

Texas A&M University Libraries have begun an extensive renovation of Sterling C. Evans Library and Annex to enhance student study and service areas. The reconstruction campaign, ReImagine, will continue through 2017. During this time, access to and from both buildings will remain open. While some floors will be cordoned off for reconstruction, ample room will still be available for students in preparation for upcoming finals.

The scope of the project includes major enhancements to Evans 2nd, Annex 1st floor, and Annex 4th floor, along with a reconfiguration of the 1st floor Evans service desk. Students will enjoy increased access to power outlets in the remodeled spaces, redesigned collaborative study areas, library classrooms with enhanced technology and the ability for more interactive, hands-on instruction. Architecturally, study and service areas will be more open and collaborative to allow students easier access to receiving help from librarians and staff for research and technological needs.

Throughout the ReImagine campaign the Libraries will be sharing updates and notifications through social media and on this microsite.